top_triangle28x18

5 Points Transportation & SR 1 Low-Stress Bike Studies

Recent Rapid Growth Increases Bike Travel, Raises Safety Concerns

Five Points Transportation Study SR 1 Low-Stress Bikeways Study Open House

DATE: Wednesday, May 21, 2025
TIME: 4:30 pm – 6:30 pm
LOCATION:  Cape Henlopen High School, 1250 Kings Highway, Lewes, DE (Google Maps

DelDOT is hosting an Open House on Wednesday, May 21st in Lewes, so that the study team can provide a review of the 2024 Five Points Transportation Study and share the schedule for the remainder of the calendar year. A brief presentation on the annual report of the study will be given at 4:30 p.m. and again at 5:30 p.m.

SR 1 between the Five Points area and Rehoboth Beach has experienced rapid growth in recent years. With that growth has come additional demand for walking and bicycling, as well as safety concerns with accommodating walking and bicycling on a wide, congested highway. This study will identify locations for continuous bikeway routes and periodic crossings that can be used by the majority of the population on both sides of SR 1 between Five Points and Rehoboth Beach and prioritize segments of the bikeway routes for design and construction.

The presentation and all related workshop documents, including comment forms, will be posted on the respective project web pages during the week of the open house:

Five Points and SR 1 Bike Study

Comment forms may also be mailed to DelDOT Community Relations, ATTN: Five Points Transportation Study, P.O. Box 778, Dover, DE 19903 or sent via email to 5Points@publicinput.com or sr1bikewaystudy@publicinput.com

Further details on the open house can be found on DelDOT’s website

Related News

This website uses cookies to ensure you get the best experience on our website.